Saturday, May 25, 2013

Captain's log Stardate 31145.7

The air conditioning on the bridge is still out and is not expected to be repaired for another three days as the engineering department has to wait on parts. Temperatures on the bridge reach 98 degrees at times and makes it very difficult to get any work done.
Commander T'Lali will be doing a radio interview tonight on trekradio.net between 1800 and 2000 hours and will be discussing everything from recruiting to the community work we do.
The main terminals seem to be operational for the moment as we prepare for an inspection from the Commodore.
I hope this heat breaks soon...

End Transmission.......

1 comment:

  1. Hello Captain, we have a visit from the Commodore? Did I miss that ready room meeting briefing ??

    ReplyDelete